Pipes in Parallel
The setup is designed to study the pipes in parallel of same diameter.
Set up consists of a set of 2 pipe test sections, supply tank, measuring tank and pump for closed loop water circulation. A set of valves is provided to conduct the experiment. The test sections are connected to differential manometer through Piezometer and gang box.
The flow rate of water is measured using measuring tank and stop watch provided
Experiments
To study the pipes in parallel.
Utilities Required
Electric supply 0.5 kW, 220V AC, Single Phase
Water supply Tap water connection â BSP Distilled water @ 60 liters (optional)
Floor Area with Drain facility
Pipes in Parallel, Heat And Refrigeration System Exporters, Heat And Refrigeration System Manufacturers